Inside Six Sigma

Praveen Gupta  |  03/01/2005

Praveen Gupta’s picture

Bio

From PDCA to PPPP

The four P’s of process management lead to quality success.

If you’re considering opportunities for business improvement, dynamic growth and profitability, “plan,” “do,” “check” and “act” (PDCA) is a leading option. Walter A. Shewhart developed the PDCA cycle in the 1920s and W. Edwards Deming made it famous in the 1980s, even though he modified the PDCA cycle to PDSA (plan, do, study and act).Today, PDCA has become a fundamental tenet of quality management. All the emphasis on process thinking is based on the PDCA cycle, be it ISO 9001, ISO/TS 16949, Six Sigma, TQM or SPC. PDCA is a closed-loop engineering application, or a feedback diagram for the quality process. In fact, if you consider the evolution of quality from in-line, on-line, off-line and quality management to the best-in-class, PDCA has held up pretty well.

Every step of the quality evolution leads to performance improvement. Increased quality leads to rising customer expectations, which in turn drives further product and process improvement. Faster and better communication, along with methodologies like Six Sigma, have evolved over time to further accelerate improvement.

During this evolution of quality, several experts have come up with their own unique twist on quality. Shewhart developed control charts, Joseph M. Juran emphasized execution or project management, Genichi Taguchi strived for performance on target and Deming targeted variability reduction. Directly or indirectly, all of these men have improved various elements of PDCA.

The PDCA cycle provides a feedback mechanism for continual quality improvement, which is similar to an engineering feedback model. The four elements of PDCA equate to the four states of a process. Deming modified the PDCA by replacing the “check” step with ”study.” The “study” step implies understanding the nature of variation in the process output. But the “act” step has led to different interpretations. For some people, “act” implies standardization, whereas for others, it means improvement. Currently, ”act" is best known as the correction of the process through corrective action and prevention from recurrence through standardization.

PDCA for Product



Examining PDCA in the context of time

In the 1920s, “plan” implied defining a process, ”do” referred to doing tasks as planned, “check” meant verifying acceptance, and “act” entailed containment, disposition and correction. Though prevention was intended, it rarely occurred. Quality management systems of the past, including TQM, have emphasized process thinking using PDCA to ensure shipment of acceptable product to the customer. The sampling plans were designed to determine quantities to check the product. In other words, the “check” step has become synonymous with “inspection” in many businesses. An inspection phase was added to weed out unacceptable product.

In practice, “act” has become the weakest link. The input to ”act” comes from ”check,” which provides inadequate and insufficient feedback for action. The data available from “check” for analysis in most companies appears to be the attribute type. It’s like counting the number of OKs, although acting on this number has been difficult. Therefore, typical root cause analysis for the rare “not OKs” has been the operator. Most companies have a problem with poor root cause analysis and recurring problems leads them to question the current PDCA model. That’s why Deming promoted the PDCA cycle for problem-solving process by modifying PDCA to PDSA.

The PDCA model was most likely developed to manage the product disposition through process control, which led to the development of workmanship standards with upper specification limits (USL) and lower specification limits (LSL). The system of limits was actually developed to verify the product, but the concept was passed on to process and design personnel. This started the concept of limits, leading to an increase in variability. At this point, Deming tried to reduce excessive variability, while Taguchi tried to avoid it by focusing on targeting in the design phase. Deming focused on reducing variation using statistical tools. Taguchi promoted the concept of “robust” engineering.

With continually improving processes and products, performance levels have reached into the single digits in terms of percentage of defects and, sometimes, in parts per millions instead of large proportion defectives. To further improve, new methodologies like Six Sigma have been developed where all aspects of a business must be improved to achieve the process output to a level close to perfection for customer requirements. Recent analysis of machining process at a company led to standard operating procedures that required set up and verification against the target values instead of the limits. This shift from production to limits led to an improvement of approximately 70 percent, with minimal effort. To institutionalize such a mindset, the PDCA must change to accommodate higher customer expectations.

The 4-P cycle comprises “prepare,” “perform,” “perfect,” and “progress” phases. The 4-P cycle is based on the closed loop feedback diagram. It has incorporated the wisdom of quality management gurus such as Karaou Ishikawa, Juran, Taguchi and Deming. For example, according to Ishikawa, the most likely process inputs are grouped in material, method, machine and manpower (4 M’s) categories. These four M’s must be managed proactively instead of sought after the postmortem through root cause analysis.

Because product and process complexity and performance expectations have been increasing, verifying the output for acceptance isn’t sufficient. The inspection and sampling plans of the past are no longer as effective as they used to be. Companies must now look at the output against the target performance, trying to be as close to the goal as possible. The deviation from the target must be understood and continually reduced. According to the Taguchi’s philosophy, the goal is to produce closer to the target and continually reduce variability around it. Focus from inspection shifted to reduction of variability in the early 1980s. Therefore, the effectiveness of PDCA must have been in question since at least then.

The four P’s of process management

The “preparation” step represents assurance of good inputs to the process. The inputs consist of Ishikawa’s 4 M’s. The goal is to ensure that these 4 Ms are delivered as inputs to the process. The “perform” step implies that the process is well-defined, mistake-proofed and understood for consistent and effective execution. The “perfect” step ensures that the process is performing as planned and that the process output is on target. If the process output isn’t on target, the gap in the “perfect” step must be recognized. The “progress” step leads to improvement in the process and its outputs if variation around the target is reduced. By continually applying the 4-P cycle, companies can reengineer a process to achieve desired results by the customer through a better process instead of a better inspection of the product.

Four P’s of Process Management


Below is a comparison between the PDCA, PDSA and the 4 P’s. The main difference lies in moving from product control to design control. Because design affects most of the cost factors, it makes sense to control design. Besides, it’s easier to achieve a faster improvement by controlling design, than by controlling a process within limits.

Comparison of PDCA, PDSA and 4 P’s
AttributePDCAPDSA4 P’s

Date of development

1920s

1980s

Present

Intended objective

Acceptable output and improvement

Continuous process improvement

Accelerate process improvement

Constraints

Specification limits

Excessive variability

Target

Expected outcome

Acceptable output through inspection

Reduced variability using statistical techniques

Robust output and improved process capability

Perceived source of problem

Operator

Process

Design

Perceived actions

Development of inspection plans

Application of statistical methods

Improvement through innovation

Typical performance

Quality control

Quality assurance

Quality engineering

The 4-P cycle is more suited in today’s environment of process management when compared with the PDCA cycle. Below, you can see that the 4-P cycle is a culmination of four major principles highlighted by four quality gurus. Thus, it’s important to question the effectiveness and the paradigm created by PDCA and consider the use of the 4-P cycle for process management and process thinking development.

Contributions to 4 P’s
4 P’s Element Quality Guru of Origin

Prepare (Manage inputs, the 4 M’s)

Ishikawa

Perform (Ensure superior execution)

Juran

Perfect (On-Target)

Taguchi

Progress (Reduce variability)

Deming

Discuss

About The Author

Praveen Gupta’s picture

Praveen Gupta

Praveen Gupta is the founding president of Accelper Consulting (www.accelper.com), has worked at Motorola and AT&T Bell Laboratories, and consulted with nearly 100 small- to large-size companies including CNA, Abbott Labs, Superior Essex, Dentsply, Hexel, Experian, Sloan Valves, Weber Markings, Wayne State (Ford), and Telular. Gupta taught Operations Management at DePaul University, and Business Innovation at Illinois Institute of Technology, Chicago. He has conducted seminars worldwide for over 20 years.

He is the author of several books including Business Innovation in the 21st Century, Stat Free Six Sigma, Six Sigma Performance Handbook, and Service Scorecard.

You can create content!

  • Classifieds
  • File Share
  • Forum Topic
  • Events
  • Links

Sign In to get started!

Quality Information