Jack E. West’s picture

By Jack E. West

If any clause in ISO 9001 has increased in importance since the release of the standard’s 2000 edition, it must be subclause 7.4 on purchasing. Not that the relative importance of the words has changed, but rather purchasing and outsourcing have become much more common and important in our day-to-day business. So the relatively small subclause on controlling purchasing may be much more important now than it was back in 2000. (I addressed outsourced processes in my May column, “Is a Controlled QMS Possible?” More about them later.)

The requirements described in ISO 9001’s subclause 7.4.1 on the purchasing process permit an organization to decide the “type and extent of control” to be used for purchasing. The organization’s selection of controls should be based on the effect of the purchased material or services on the product realization processes and on the finished products delivered by the organization to its customers. If purchased materials or services have little effect (e.g., a threaded fastener that’s used inside a noncritical subassembly), then minimal control is needed.

Scott Paton’s picture

By Scott Paton

I‘ve been doing quite a bit of home improvement recently--installing new flooring, painting, etc. I’ve got a few sore muscles but the sense of pride in my achievement (plus the money I saved by doing it myself) makes it all worthwhile.

I have to admit that I’ve never been very handy, and I’ve never really gotten the thrill that some people find from “doing it myself.” My brother genuinely enjoys home improvement and could probably build an exact replica of the Taj Mahal given enough time. Usually my home improvements stem from the need to save money.

This current project--replacing wall-to-wall carpeting with wood flooring--was something that I never thought I would (or could) do. But after some words of encouragement from friends (thanks, Jeff) and getting quotes of $3,000 to install flooring in just one room, I thought it was worth the try. I researched the products, bought the necessary tools, watched a bunch of videos on installation (God bless, You Tube), and took the plunge. Three days later my room was done, it looks terrific, and I saved about $2,500.

H. James Harrington’s picture

By H. James Harrington

Last month we reviewed how Ford Motor Co.’s lean concepts were slowly phased out of the organization. The concepts, however, weren’t lost: Toyota realized their potential and improved upon them.

Toyota’s chief of production, Taiichi Ohno, embraced Ford’s concepts wholeheartedly. He applied them to machining operations and then to other areas of production. As a result, the Toyota Production System (TPS) was born in the 1960s and nurtured through the 1970s.

The real test of the TPS came in 1984, when Toyota and General Motors formed a joint venture called New United Manufacturing Inc. to build a car sharing designs, assembly processes, suppliers, and people. Although the venture’s performance didn’t meet expectations, the lean concept began there and spread to other U.S. and international organizations.

Meanwhile, IBM started focusing on process improvement. Since the late 1970s it had benchmarked its international internal operations and gathered best practices from Japan, Germany, and the United States. These best-practice approaches were called “process compatibility.” They focused on streamlining all support processes and used tools such as flowcharting, as-is process mapping, and value engineering.

Tom Pyzdek’s picture

By Tom Pyzdek

The following personal stories concern vehicles produced by the automaker that invented lean and is world-famous for its efficient manufacturing operations:

My old SUV’s bright headlights don’t work. When I hit the switch for the brights, the headlights turn off completely. This will cost me $400 to fix because it requires replacing an entire steering wheel subassembly.

My wife’s car needs a filter replaced; it’s routine maintenance. It will cost several hundred dollars because it requires extensive disassembly to get to the filter, which has to be done by going through the glove compartment.

I once lost the key to my car. It was one of those keys with security features, and it opened the doors and trunk. It cost me nearly $300 to replace the key. (This was four years ago, when the dollar was still worth something.) I was told that if I lost my remaining key, it would cost me $3,000 to get a new key because the car’s computer security hardware would need to be replaced. As you might imagine, this would require extensive disassembly.

Denise Robitaille’s picture

By Denise Robitaille

A couple of months back I was watching “Are You Smarter Than a Fifth Grader?”--one of the more enjoyable game shows in recent memory. The premise is that the contestants should be able to answer the questions, since it’s stuff we learned during or prior to the fifth grade--nothing deceptively clever or arcane; just facts and information, history, science, grammar, and current geography. The questions get harder as you move from the first to the fifth grade, with correspondingly higher monetary prizes.

This night the contestant made it to the $1-million level. If you win at this point, you get the million; if you lose you go back to a measly $25,000 and you have to face the camera and admit that you’re not smarter than a fifth grader.

The question was, “Who was the longest reigning monarch of England?” Well, I knew this answer hands down. Oh, how I wished I was on that stage. I’d become a millionaire. I would be smarter than a fifth grader. I was absolutely sure of it. Except… I was dead wrong. I would have lost thousands of dollars and I would have had to make the humiliating admission as to my diminished level of smartness.

Scott Paton’s picture

By Scott Paton

By the time you read this, the new version of ISO 9001 should be out. ISO 9001:2008 is the result of years of work by an international team of volunteer experts. These dedicated men and women gave up hundreds of hours of their time and traveled to locations around the world, usually at their own expense, to revise the standard.

The revision process began almost as soon as the year 2000 version of the standard was published. In fact, work on the next revision of the standard--slated for the year 2015--has already begun.

Most people have three primary questions about the new standard:

What’s new?

When does it take effect?

How long do I have to transition to the new standard?

 

H. James Harrington’s picture

By H. James Harrington

One of the major causes of TQM and Six Sigma failures is selecting the wrong project. This selection is probably one of the most important decisions that management can make to support the improvement process.

There are many approaches that can be used to select projects. They range from management intuition to complex analyses of how the processes affect business opportunities. I will show you a weighted selection approach that is effective, using a health care example.

In this approach each opportunity is evaluated in a number of parameters. For example:

A) Changeability = 2 points

B) Reduce cost = 2 points

C) Decrease mortality = 5 points

D) Improve patient care = 4 points

E) Improve staff morale = 3 points

F) Reduce wait time = 1 point

 

Each of these parameters is weighted by a point score from one to five. A rating of one indicates that it’s low priority, and a rating of five indicates that it’s very high priority.

Tom Pyzdek’s picture

By Tom Pyzdek

Although I’ve spent my entire career working in the quality and process improvement fields, my undergraduate degree is in economics. I learned that economic cycles are normal. Economic downturns result when there is an imbalance in the economy. Past recessions have developed when businesses overestimated future demand and overproduced. When businesses realized their inventory was large relative to actual demand, they cut production and used various means to sell their excess inventory. Thanks in part to quality professionals implementing lean and other improvement processes, this source of imbalance is less common and less severe. However, as is now obvious, there are other ways to screw up an economy.

Tom Pyzdek’s picture

By Tom Pyzdek

Over the years I’ve lost count of how many times I’ve heard the lament, “We don’t have management support!” I sympathize. Lack of management support is without a doubt one of the prime causes of failed process and quality improvement efforts. Without leadership backing, any organizationwide initiative is ultimately doomed. This column will explain why it’s not enough to ask for support in general. If you’re not very specific, you might find that the management support you asked for ends up killing you with kindness. Consider the following ineffective strategies:

Strategy No. 1: Command people to act as you wish. People in less senior levels of an organization often have an inflated view of the value of raw power. In truth, even senior leaders have limited power to rule by decree. Human beings by their nature tend to act according to their own best judgment. The result of invoking authority is that decision makers must constantly try to divine what the leader wants them to do in a particular situation. This leads to stagnation and confusion as everyone waits on the leader. Even under the best circumstances, people will often misinterpret the leadership’s commands.

Jack E. West’s picture

By Jack E. West

Although other aspects of controls required by ISO 9001 may be critical, none receives as much attention as subclause 7.5.1--”Control of production and service provision.” Almost every organization must develop processes for delivering services or producing products. Subclause 7.5.1 focuses on the key concept that processes must be carried out under controlled conditions. Considerations for achieving controlled conditions are clearly stated, along with the requirements to determine the extent to which production and service operations are planned, established, documented, verified, and validated.

These considerations begin with understanding the specifications for the product that the processes will produce. The organization must determine the production and service processes that should be controlled and the outputs that must be achieved at each stage of processing.

Also, the organization must consider the equipment necessary to meet the product requirements, including their sequence and operating conditions. In some cases new equipment must be designed or procured.