Jodi Ullman glanced at her watch: 10:25 a.m. She pushed back from her desk, stood up, and stretched—after first peeking out the door of her office toward the cubical maze to make sure no one was watching. She’d been staring at the screen of her laptop for two hours, poring over the latest qualification test data for a new component. As the quality director for Kulshan Industries, a midsized aerospace manufacturer, she had been spending hundreds of hours working toward the rollout of their latest product—a special electronic control system for a new type of unmanned aircraft. The system was formally named “Natural Instrumentation True Matching Response.” Internally, it was referred to by its acronym NITMAR. However, in private, the project had begun to be referred to as “Nightmare.” After the initial elation at winning the multimillion dollar bid wore off, the realities of actually designing, building, testing, and integrating the system began to set in. “Nightmare” was truly a more accurate moniker.
The NITMAR project was a risk for Kulshan. The founder had started the company out of a small machine shop back in the 1940s as a war-time supplier of precision aircraft instrumentation. The rapid growth of commercial aerospace in the 1950s coupled with dogged determination by the founder transformed Kulshan into a diverse component manufacturer known for its simplicity, quality, and reliability.
The aerospace business changed rapidly in the 1990s due to evolving commercial and military requirements. Smaller companies had been predominantly replaced by offshore alternatives or absorbed by larger entities through acquisition. Pressure to increase quality, decrease price, and shorten lead times forced companies to make radical changes. Kulshan had survived these changes so far, but this was a new world for them. They now had to design and build entire electronic systems—not just high-quality components. While the Kulshan brand remained robust in the market, everything was on the line—they had to prove that they could evolve to satisfy the demands of their changing market.
As Jodi walked to the break room for a new cup of coffee, she was intercepted by Jerry Smith, a senior quality engineer and one of her direct reports. Jerry was agitated. He quickly told her about a new problem that had been discovered during testing of a NITMAR component. A resistor on the main control board failed to pass inspection that morning. Initial observations showed that the solder on the resistor lead had likely been contaminated, which caused the solder to create an imperfect connection between the resistor lead and the circuit board. Resistors and other components are hand-soldered into place by an electronics specialist. Contamination of the solder (externally with dust, grease, or internal impurities in the solder itself) creates an incomplete bond, which could impair the electrical connection. Jerry wanted a complete root cause analysis (RCA) run on the contaminated solder. He was insistent about how lucky they were to find this particular problem before the board was assembled into the rest of the system. Once assembled, only a failure of the system upon testing or in service would have brought the problem to light.
Six months prior, Kulshan had hired a provider of RCA training to train 50 employees, including 10 who completed an additional advanced course. Jodi actually had prior experience with two advanced root cause analysis methods, as well as with the remedial 5 Whys and fishbone diagrams. She liked root cause analysis and was open-minded to Jerry’s request. Technically, he was correct; they should do a full RCA to ensure they didn’t miss anything. However, she had been through too many boardroom arguments about time, schedule, and margin. Everyone on the Kulshan leadership team vocally supported the quality program—including running an RCA—but sometimes had difficulties reconciling the additional costs with the “potential” benefits of finding solutions that prevent recurrence.
When do you account for these additional costs? When the sales team puts together a competitive bid, it’s understandable that they don’t allocate a line in the bid to accommodate anomalies like this. Who could expect to win a project when they plan for failure? Could Jodi support Jerry’s request for an RCA without affecting and upsetting a host of other areas, including operations, production scheduling, integration, and testing? What if the customer found out about the investigation—which might not present Kulshan in the most positive light—particularly when there seemed to be more serious problems with NITMAR.
Jerry estimated the RCA would take three full days and require five key people, with others called in periodically to provide input. That seemed like a lot for a simple case of contaminated solder, even to Jodi, but Jerry’s timing was perfect. He’d caught Jodi on the upswing in her coffee cycle and she was feeling optimistic. She gave him the go-ahead to conduct the RCA.
Two hours later, she received an e-mail from Jerry that he had distributed the meeting request for the RCA. On the “required to attend” list, he included another quality engineer, the technician who installed the resistor, a production manager, a design engineer, and two advanced-training RCA students who needed additional practical experience.
Within five minutes, Nancy Murray, the director of operations, was standing in Jodi’s office doorway. Nancy and Jodi got along most of the time, but there was constant tension between production and quality. Nancy believed in holding production-line employees personally accountable for errors, yet she rewarded successes generously. She was accustomed to this carrot-and-stick strategy and she didn’t fully trust any process that didn’t include personal accountability. In this case, she and her staff believed that the electrical specialist made an error in using the contaminated solder for it was known that this brand of solder had periodic contamination issues. The decision was made three weeks ago in the production meeting that employees were to be informed of the problem, and they must watch for telltale signs of contamination until they used up the remaining stock of solder.
Nancy couldn’t afford to tie up her employees for three days for what she deemed was obviously a cut-and-dry case. At most, couldn’t they just do a fishbone exercise and be done in an hour? What could possibly take three days? Jodi tried to explain that three days was just an estimate, and that there might be other issues—even significant ones—discovered from a full investigation. She also tried to explain that the fishbone method could be confusing and that it led to solutions that were typically ineffective—retrain the worker, council the worker, change the procedure, etc.—all steps she had heard a thousand times, but seemed to not make a sustainable difference.
Nancy was adamant that she couldn’t afford to have people away from their jobs for that amount of time. Jodi saw that the issue wasn’t going to be resolved with each of them entrenched in their positions. She told Nancy that they needed to take the issue to the vice president to decide how to proceed.
What decision should the vice president make? Is a full RCA required in this case or is it overkill given the business environment?
Leave your comments in the “comments” box below. There will be a follow-up article in a couple of weeks on how industry experts would have dealt with this issue.