Joseph J. Caylor  |  06/09/2008

Joseph J. Caylor’s default image

Bio

What’s in It for Me?: Work Instruction No. 1

Defective material report

ABC Company Work Instruction

Purpose: To initiate a DMR for internal nonconformance, subcontractor nonconformance, rework, or sorting.

Work description: A DMR is used to determine the nature of defect(s), establish a temporary remedy, determine the apparent root cause, establish corrective action, and do preventive planning for internal nonconformance and subcontractor nonconformance.

Safety considerations: Observe all written and oral safety instructions, appropriate checklists, and guidelines. Practice safe workplace practices.

Maintenance: None

Special Procedures: None

 

Back to the article, “What’s in It for Me?



Discuss

About The Author

Joseph J. Caylor’s default image

Joseph J. Caylor

Joseph J. Caylor is principal of Ceethree Co., a management systems consulting, training, and auditing company. He’s a Six Sigma Black Belt, a quality engineer, a quality auditor, and a calibration technician. He’s also certified by the American Society for Quality as a manager of quality and organizational excellence, and by the Registrar Accreditation Board as a quality systems and environmental systems auditor.

You can create content!

  • Classifieds
  • File Share
  • Forum Topic
  • Events
  • Links

Sign In to get started!

Quality Information